Changes the active level sequence to a new level sequence.
Target is Level Sequence Playback Controller
Select Asset
Select Asset
|
In
Exec
|
|
|
Target
Level Sequence Playback Controller Object Reference
|
|
|
In New Level Sequence
Level Sequence Object Reference
|
The LevelSequence to select |
|
Out
Exec
|
|
|
Return Value
Boolean
|
true if a valid LevelSequence was passed and sequencer was successfully found. |